DESIGN & BUILD COMPANY

Multi-purpose Hall
Role
Subcontractor
Location
Prague, Czech Republic
Year
2017
Delivery team
Loading s.r.o.
From start to finish
Loading s.r.o. was proud to take part in building a multi-purpose hall in Augsburg as a key subcontractor, providing comprehensive construction services from initial planning through to final completion. Our role was to carry out the construction work to the client's strict specifications. We worked with our experienced specialists, who made sure every step of the project was carried out with the utmost care and professionalism. Our work included installing specialised equipment, placing furniture and finishing every aspect of the space to perfection, always aiming for 100% customer satisfaction.
The full process
2017 2/4q - 2017 2/4q
Preparing the work after consulting the client:
-
After consulting the client, we start by preparing a detailed plan that reflects their requirements for the construction work. Our specialists analyse the spatial layout and colour schemes to achieve the desired look and functionality.
2017 2/4q - 2017 3/4q
Thorough preparation of the space for renovation:
-
Before the renovation itself, the space has to be carefully prepared.
-
This includes dismantling existing equipment and fittings, removing surface layers and, where needed, carrying out structural alterations.
2017 3/4q
Completion: detailing and fine-tuning to a perfect design:
-
After the core construction work, we move on to the final phase of the Kogo restaurant renovation, which has four main steps: installing the new equipment, placing furniture to the exact design specifications, supplying and installing decorative elements to create a pleasant atmosphere, and thoroughly checking and adjusting every detail. The aim is a final result that meets and often exceeds the client's expectations, creating the ideal setting for a unique dining experience.
Preview






